| ||
Precast Concrete FormsApplication Suggestions
|
|
Bridge Sections Cast On Site
THE CHALLENGEThe construction site is the bridge replacement on Interstate 95 in Connecticut over the Connecticut River in which the bridge sections are cast on site. THE SOLUTIONFive SVRF-5500 High Frequency Vibrators were installed on each bridge section form which eliminated the honeycombs and imperfections. These vibrators were operated with 90 PSI air. |
Concrete Columns Concrete Septic Tanks and Vaults Concrete Steps Tampers and Trowels Screeds Precast Forms Concrete Pipes Manholes and Box Culverts Concrete Tunnels 75 STILSON RD, P.O. Box 8 WYOMING, RI 02898 Phone: (401) 539-2392 (800) 633-0032 Fax: (401) 539-2584 E-Mail:vibrators@vibco.com Read more industry news on the VIBCO Vibrators Blog http://vibrationnationblog.blogspot.com |